Ötztal Tourist Center / Obermoser + partner architekten
由專筑網小R編譯
設計理念。這座建筑與現有建筑保持有一定的距離,其光照程度、與周邊的景觀關系,以及建筑之間的空腔都經過了細致的規劃。
Design concept. The building is located at a respectful distance from the existing buildings. The amount of light exposure, the visual relationships to the landscape, and the generous voids between existing tissue and new volume have been thoughtfully planned.
就高度和體量來說,建筑依據整體規劃錯落有致,在特定的朝向構成具有吸引力的外觀形態,建筑體量向前傾斜,其中包含了前側院落,從而在廣場上也擁有一席之地,似乎在歡迎來訪者。
In terms of height and volume, the building reacts to its immediate surroundings by respectfully sinking and rising in correspondence to given alignments, shaping its appearance and orientation in an ideal relationship to the given location. By dynamically leaning forward, the volume formally encloses the forecourt, gaining clearly a prominent role within the town square and symbolically bowing to the guests.
廣場和地面幫的鋪地材質模糊了室內外空間的界限,這是在向人們發出邀請,地面層西側設置有玻璃幕墻,立面呼應了開放形態,其木質外殼面向廣場和河流敞開。
One homogeneous paving material for the forecourt and ground floor blurs intentionally the boundaries between outdoor and indoor, as an inviting gesture to the guests. With a glazed front on the ground floor westside, the façade echoes this open attitude, lifting its wooden shell like an open mouth towards the square and the river.
廣場有著自由的形式,因此可以靈活地服務于各項功能,同時建筑內部的交互式展覽展現了周圍的環境以及發展潛力,建筑的室內空間環繞著一個中央核心筒,這里有著一個開放的樓梯和貫穿室內的電梯,并且結合周邊酒店設置有地下汽車通道。
The square can be flexibly reorganized for various events thanks to its formal freedom, while indoor interactive exhibitions present the natural surroundings nearby and their unexplored potential. The building interiors are organized around a central distribution core, with an open staircase and an elevator piercing the interior spaces. Underground car access is provided by the garage of the adjacent hotel.
在上部樓層,靈活的布局、通高的家具,以及區分功能的玻璃隔斷都重新定義了工作區域,同時也能夠依據功能靈活分布,創意性元素在不同的時期給不同的功能區域帶來了靈活的解決策略,傾斜的屋面是建筑的一大特征,這構成了寬敞的空間,大型玻璃框架在自然環境、建筑,以及使用者之間構成了特別的互動。
On the upper floors, flexible distribution arrangements, floor-to-ceiling furniture, and glass partitions clearly define working groups and thematic areas, rearrangeable anytime. Constructive elements enable as well free distribution and versatile solutions for any functional area, over any fruition period. As a particular feature on the top floor, a sloping roof generates a generous space, while an oversized glass frame creates an extraordinary interplay between natural surroundings, buildings, and users.
施工。建筑師們選擇了木質結構元素,大大縮短了施工時間,這也是該項目對于自然的保護承諾,建筑材料在當地生產,執行程序保障了低能耗標準,因此也滿足了能源優化策略,建筑的地下室應用了防水鋼筋混凝土,車庫增加了許多停車位,滿足了最大的容量需求。
Construction. Our choice to employ structural wooden elements enabled short construction times and it’s a clear sign of our commitment to nature. Materials could be locally produced and quickly delivered. The execution procedures guaranteed the implementation of low-energetic standards and thus an energy-optimized building. The basement was built in waterproof reinforced concrete. The underground garage has been designed to fulfill a maximum capacity usage, further implemented by an additional number of parking places.
材料。區域材料的選擇和應用呼應了周邊環境,建筑師進行巧妙的布局,讓建筑擁有現代的特征,同時也借鑒了傳統工藝。
Materiality. Regional materials have been chosen with a clear reference to the surrounding landscape. Through skillful arrangements and combinations, the building got a modern, honest character with a strong reference to traditional craftsmanship.
寬敞的地面層應用了高科技信息和線性設計策略,表達了Ötztal游客中心的前瞻性特征,建筑外部覆蓋著灰色落葉松木,還結合有通高的窗戶,以及開放式玻璃幕墻,構成了特殊的外部形態,讓建筑從周邊環境脫穎而出。
The spacious ground floor, with its high-tech information point and a restrained linear design, reflects the forward-looking strategy of Ötztal Tourism. The outer skin clad in pre-grey larch shingles, full-height-wooden windows, and the open glass façade on the ground floor created a distinctive overall image, outgrowing the surrounding buildings.
建筑設計:Obermoser + partner architekten
類型:辦公
面積:15985平方英尺(約1485.1平方米)
時間:2021年
攝影:Christian Flatscher
制造商:AutoDesk, Nocker, Tip Top Fenster, Tischlerei Riml, Zimmerei Thurner
結構工程:ZSZ Ingenieure ZT GmbH
電力工程:Eidelpes Ingenieurbüro für Elektrotechnik
聲學顧問:FIBY ZT-GmbH
建筑項目主要設計人:Johann Obermoser
建筑項目執行負責:Christoph Neuner
建筑團隊:Felix Fehr, Sandra Seeber, Andreas Norz
建筑功能:公共信息中心與辦公
城市:Sölden
國家:奧地利
OFFICES
SÖLDEN, AUSTRIA
Architects: Obermoser + partner architekten
Area: 15985 ft2
Year: 2021
Photographs: Christian Flatscher
Manufacturers: AutoDesk, Nocker, Tip Top Fenster, Tischlerei Riml, Zimmerei Thurner
Structure Engineers: ZSZ Ingenieure ZT GmbH
Electric Engineers: Eidelpes Ingenieurbüro für Elektrotechnik
Acoustic Consultants: FIBY ZT-GmbH
Architecture Project Leader Design: Johann Obermoser
Architecture Project Leader Execution Phase: Christoph Neuner
Architecture Team: Felix Fehr, Sandra Seeber, Andreas Norz
Program / Use / Building Function: Public information center and offices
City: Sölden
Country: Austria
|
|